2.10 Check Done!

Congratulations!

Basic Function Testing Completed Successfully

All I/O interfaces have been verified and are functioning normally.

Next Steps:

  • Configure YAML files according to your machine specifications
  • Double-check jumper positions match your device operation mode
  • Verify all connections before applying power
  • Proceed with system integration and calibration
  • If you have the matching accessory, continue to 3.1 Test RJ12 Port; otherwise continue to 4.0 Pre-Operation.