2.5 Test Probe and Endstop Inputs

Check List · Step 5 of 12 · Use jumper caps to test the probe and limit switch input signals
ℹ️
Objective: This step checks whether the probe and limit switch input circuits are working correctly. Each input is tested by shorting its SIGNAL pin to GND with a jumper cap.
⚠️
SAFETY FIRST: Please ensure correct pin connections to avoid short circuits during testing. Only short the specified SIGNAL and GND pins.
1
Initial Limits Check
Display before inserting jumper caps:
$limits
Send ! to exit
Homing Axes : xyzabc
Limit Axes :
  PosLimitPins NegLimitPins Probe Toolsetter
:
:
:
:
:
:
:
2
Trigger Test with Jumper Caps
💡 Use jumper caps to short each input SIGNAL pin to GND. There are 10 inputs to test in total. Test them one by one, or install all 10 jumper caps for a full trigger check.
PiBot V5.88 Ultra probe and endstop input jumper test
Reference image: insert jumper caps between SIGNAL and GND for the probe and endstop input test.
Display after inserting jumper caps:
:  xy                      xyzabc                  P T
:  xy                      xyzabc                  P T
:  xy                      xyzabc                  P T
:  xy                      xyzabc                  P T
:  xy                      xyzabc                  P T
At the same time, the corresponding input indicator LEDs on the motherboard should be ON.
3
Exit Monitor Mode
4
Jumper Removal

🔧 Quick Troubleshooting

Expected Results