Congratulations!
Basic Function Testing Completed Successfully
All I/O interfaces have been verified and are functioning normally.
Next Steps:
- Configure YAML files according to your machine specifications
- Double-check jumper positions match your device operation mode
- Verify all connections before applying power
- Proceed with system integration and calibration
- If you have the matching accessory, continue to 3.1 Test RJ12 Port; otherwise continue to 4.0 Pre-Operation.